Coastal Cities as Sustainable Economic Hubs
Water Supply and Sanitation in Moldova Center
Hydraulic and sanitation Millennium programme
Rural Water Supply IV
Green Infrastructure Beira
Adaptation to climate change in Mozambique (ACCM)
Storm Water Drainage System Beira – Adaptation to climate change
Uganda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Tanzania – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Kenya – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Rwanda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Consulting Services for the reconstruction and expansion of sewerage systems in Nukus, Takhiatash, Khodjeyli and Kungrad of Karakalpakstan
Improved water and wastewater services program (IWSP I), Phase 2
As the Implementation Consultant of the large investment Program IWSP 1, we are providing comprehensive project implementation and management services on behalf of the Project Management Unit (PMU). The Investment Component aims at improving the physical water supply and wastewater infrastructure in four target Governorates.
The Technical Assistance Component supports the PMU of the Holding Company for Water and Wastewater in the overall technical and financial program management. The investment budget for the program is 272 mEUR covering about 60 singular measures (water supply and wastewater) from Phase 1 to be completed as well as about 70 singular projects (wastewater only) to be prepared and implemented under Phase 2.
For improvement of the water supply services 11 water treatment plants were constructed. The total water supply network implemented has a length of 250 km. In the wastewater sector 10 WWTPs were rehabilitated/extended and two new WWTPs constructed. Rehabilitation/extension of the sewer network covers 676 km of network including 34 pumping stations.
Water & Sanitation Sector Development Program – Lake Victoria South (Kericho, Kisii, Nyamira and Litein)
Maseru Wastewater Project
Nairobi city water distribution network modifications project
Primary education program, Phase I – Niamey, Tillaberi, Tahoua
Consulting Services for the establishment of an Integrated Water Resources Management Information Sytem, Zambia
Technical and vocational education and training Phase II – TVET II Rwanda
Consulting Services for the implementation of PMRI II (Nazca)
National Program for Proximity Irrigation – Components Réagir and Irrigar
Consultancy services for the implementation of a health program in Niger
Program for Investment in Inter-community Irrigation, Phase 2 (SIRIC II)
PRODIA – Integrated Development Programme for Autarchies and Surrounding Rural Zones
Program Guadalquivir Water and Sewerage
Promotion of reproductive and family health
Consulting Services for the implementation of PMRI II (Chincha)
Wastewater Disposal in Provincial Towns Can Tho, Soc Trang, Tra Vin
Rural Water Supply III
Lusaka Sanitation Program
More Income and Employment in rural areas through improved infrastructure and financing (MIERA)
Consulting Services for the implementation of PMRI II (Juliaca)
Vieux Fort Water Supply Redevelopment Project
Wastewater disposal in provincial towns program in South Vietnam – Soc Trang Urban wastewater project, Phase II
Water Supply & Basic Sanitation in Hargeisa
Sustainable Land Management in the Biji catchment area
Technical and Vocational Education and Training (TVET), Mozambique
Irrigation program „Water and climate change“ PACC I
IWRM / Kaps Dam at Akhouryan River, Phase 1
Kaps Dam was partially constructed for irrigation purposes during the 1980s, but not completed. The uncompleted dam is a permanent hazard, as the river diversion using the construction tunnel may not cope with extreme floods with potential serious consequences to the downstream areas, including the outskirts of Gyumri city. The Kaps dam and reservoir are in a highly seismic zone with active faults, with difficult geological and seismic conditions.
The project measures comprise rehabilitation and construction of Kaps Reservoir of 25 million m³ including appurtenant structures (embankment, spillway, diversion tunnel, irrigation tunnel, tunnel for conveyance system). The measures shall allow for the increase of Kaps reservoir at later stage of up to 60 million m³. The main Tasks are
I. Assistance and Coordination in overall Project Steering/Management and Quality Assurance during the entire Project
II. Update of Feasibility Study, Preparation of Detailed Design & Tender Documents (FIDIC Pink Book), Assistance in Tendering
III. Construction Supervision for Phase 1
Second Dushanbe Water Supply Project (DWSP2 / DWSP2af)
Water supply and sanitation for small towns in Bustillos
Urban Governance and Decentralisation Programme (UGDP)
Training measures to MED staff – Rehabilitation of pumping stations II program
Improving the capacity of the Holding Company for Water and Waste Water (HCWW)
Oguz-Gabala-Baku Water, Phase I – III
PTOP – Provincial towns open program
Kampala Water – Lake Victoria WatSan Project – Package 1 and 3 Rehabilitation and Water Production Capacity Optimisation of Ggaba Water Treatment Complex & Transmission Improvement
Technical assistance for the feasibility study and designs for water investments in 6 towns
Establishment and Implementation of a Basket Financing Mechanism under the National Urban Water Supply and Sanitation Programme
Consultancy Services for Water and Sanitation in Mtwara and Babati and for Sanitation in Kigoma, Lindi and Sumbawanga
Technical assistance in project preparation in the wastewater and drinking water sector
Primary and secondary education of the Methodist church II
Consultancy services for detailed design and construction supervision for water distribution network rehabilitation and expansion in Lilongwe city
Technical and Vocational Education and Training (TVET)
Water supply Loukkos
Water Management and Development Project (WMDP) Feasibility study, detailed design and tender documents for Mbale & Small towns Water Supply and Sanitation project
Consulting Services for the Hai District Water Supply Project, Phase I – IV
Water Supply and Sanitation Programme for Nzoia Cluster Phase I, II and III