Feasibility Study – Wastewater Treatment Babu Sabu in Lahore
Feasibility study – Sanitation and rainwater drainage project in Al Khalidiya
Feasibility study – Sanitation and rainwater drainage project in Al Hamza
Coastal Cities as Sustainable Economic Hubs
Hydraulic and sanitation Millennium programme
Rural Water Supply IV
Clean Town – Pink Lake, Nakuru Town Development and Biodiversity Conservation Project (LNBCP)
Green Infrastructure Beira
Adaptation to climate change in Mozambique (ACCM)
Storm Water Drainage System Beira – Adaptation to climate change
Uganda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Tanzania – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Kenya – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Rwanda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Consulting Services for the reconstruction and expansion of sewerage systems in Nukus, Takhiatash, Khodjeyli and Kungrad of Karakalpakstan
IWRM Plan for Serengeti National Park
Perú, Programa PTAR – II Estudios de Pre-inversión para Chimbote y Nuevo Chimbote
Upscaling Nature-Based Flood Protection in Mozambique’s coastal cities
Improved water and wastewater services program II (IWSP II)
Improved water and wastewater services program (IWSP I), Phase 2
As the Implementation Consultant of the large investment Program IWSP 1, we are providing comprehensive project implementation and management services on behalf of the Project Management Unit (PMU). The Investment Component aims at improving the physical water supply and wastewater infrastructure in four target Governorates.
The Technical Assistance Component supports the PMU of the Holding Company for Water and Wastewater in the overall technical and financial program management. The investment budget for the program is 272 mEUR covering about 60 singular measures (water supply and wastewater) from Phase 1 to be completed as well as about 70 singular projects (wastewater only) to be prepared and implemented under Phase 2.
For improvement of the water supply services 11 water treatment plants were constructed. The total water supply network implemented has a length of 250 km. In the wastewater sector 10 WWTPs were rehabilitated/extended and two new WWTPs constructed. Rehabilitation/extension of the sewer network covers 676 km of network including 34 pumping stations.
Scaling Up Nutrition and WASH Infrastructure (SUNWIP)
Water & Sanitation Sector Development Program – Lake Victoria South (Kericho, Kisii, Nyamira and Litein)
Nairobi city water distribution network modifications project
Consulting Services for the establishment of an Integrated Water Resources Management Information Sytem, Zambia
Technical and vocational education and training Phase II – TVET II Rwanda
Consulting Services for the implementation of PMRI II (Nazca)
National Program for Proximity Irrigation – Components Réagir and Irrigar
Feasibility Study for water and wastewater Himara
Program for Investment in Inter-community Irrigation, Phase 2 (SIRIC II)
PRODIA – Integrated Development Programme for Autarchies and Surrounding Rural Zones
Program Guadalquivir Water and Sewerage
Consulting Services for the implementation of PMRI II (Chincha)
Wastewater Disposal in Provincial Towns Can Tho, Soc Trang, Tra Vin
Rural Water Supply III
Consulting Services for the implementation of PMRI II (Juliaca)
Wastewater disposal in provincial towns program in South Vietnam – Soc Trang Urban wastewater project, Phase II
IWRM / Kaps Dam at Akhouryan River, Phase 1
Kaps Dam was partially constructed for irrigation purposes during the 1980s, but not completed. The uncompleted dam is a permanent hazard, as the river diversion using the construction tunnel may not cope with extreme floods with potential serious consequences to the downstream areas, including the outskirts of Gyumri city. The Kaps dam and reservoir are in a highly seismic zone with active faults, with difficult geological and seismic conditions.
The project measures comprise rehabilitation and construction of Kaps Reservoir of 25 million m³ including appurtenant structures (embankment, spillway, diversion tunnel, irrigation tunnel, tunnel for conveyance system). The measures shall allow for the increase of Kaps reservoir at later stage of up to 60 million m³. The main Tasks are
I. Assistance and Coordination in overall Project Steering/Management and Quality Assurance during the entire Project
II. Update of Feasibility Study, Preparation of Detailed Design & Tender Documents (FIDIC Pink Book), Assistance in Tendering
III. Construction Supervision for Phase 1
National Solid Waste Management Programme (NSMWP)
Land Husbandry, Water Harvesting and Hillside Irrigation Project LWH
Oguz-Gabala-Baku Water, Phase I – III
PTOP – Provincial towns open program
Consulting services to determine the feasibility of water supply and wastewater investments in 12 Rayons
Technical assistance for the feasibility study and designs for water investments in 6 towns
Rural Water Supply and Sanitation in the region Mayo Kebbi West
Consultancy Services for Water and Sanitation in Mtwara and Babati and for Sanitation in Kigoma, Lindi and Sumbawanga
Technical assistance in project preparation in the wastewater and drinking water sector
Calueque – Oshakati Water Pipeline Project Consulting Services for Pre-Feasibility Study
Feasibility Study for Water Infrastructure in Central Moldova
Component LAIF- consulting services for Wastewater Management and Reuse in Lima
Technical Assistance for Preparation of Integrated Water Measures in Pernik and Vidin
Water Management and Development Project (WMDP) Feasibility study, detailed design and tender documents for Mbale & Small towns Water Supply and Sanitation project
Improving and developing water supply and sanitation systems in rural communities
Water Supply and Sanitation Programme for Nzoia Cluster Phase I, II and III