Feasibility Study – Wastewater Treatment Babu Sabu in Lahore

Coastal Cities as Sustainable Economic Hubs

Water Supply and Sanitation in Moldova Center

Hydraulic and sanitation Millennium programme

Rural Water Supply IV

Green Infrastructure Beira

Storm Water Drainage System Beira – Adaptation to climate change

Uganda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2

Tanzania – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2

Kenya – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2

Rwanda – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2

Consulting Services for the reconstruction and expansion of sewerage systems in Nukus, Takhiatash, Khodjeyli and Kungrad of Karakalpakstan

Improved water and wastewater services program (IWSP I), Phase 2

As the Implementation Consultant of the large investment Program IWSP 1, we are providing comprehensive project implementation and management services on behalf of the Project Management Unit (PMU).  The Investment Component aims at improving the physical water supply and wastewater infrastructure in four target Governorates.

The Technical Assistance Component supports the PMU of the Holding Company for Water and Wastewater in the overall technical and financial program management. The investment budget for the program is 272 mEUR covering about 60 singular measures (water supply and wastewater) from Phase 1 to be completed as well as about 70 singular projects (wastewater only) to be prepared and implemented under Phase 2.

For improvement of the water supply services 11 water treatment plants were constructed. The total water supply network implemented has a length of 250 km. In the  wastewater sector 10 WWTPs were rehabilitated/extended and two new WWTPs constructed. Rehabilitation/extension of the sewer network covers 676 km of network including 34 pumping stations.

Scaling Up Nutrition and WASH Infrastructure (SUNWIP)

Water & Sanitation Sector Development Program – Lake Victoria South (Kericho, Kisii, Nyamira and Litein)

Maseru Wastewater Project

Nairobi city water distribution network modifications project

Primary education program, Phase I – Niamey, Tillaberi, Tahoua

Consulting Services for the establishment of an Integrated Water Resources Management Information Sytem, Zambia

Technical and vocational education and training Phase II – TVET II Rwanda

Consulting Services for the implementation of PMRI II (Nazca)

National Program for Proximity Irrigation – Components Réagir and Irrigar

Consultancy services for the implementation of a health program in Niger

Consulting Services for the extension of sewerage network Esquema Cajamarquilla, Nieveria y Cerro Camote

Program for Investment in Inter-community Irrigation, Phase 2 (SIRIC II)

Program Guadalquivir Water and Sewerage

Promotion of reproductive and family health

Consulting Services for the implementation of PMRI II (Chincha)

Wastewater Disposal in Provincial Towns Can Tho, Soc Trang, Tra Vin

Rural Water Supply III

Lusaka Sanitation Program

More Income and Employment in rural areas through improved infrastructure and financing (MIERA)

Consulting Services for the implementation of PMRI II (Juliaca)

Vieux Fort Water Supply Redevelopment Project

Wastewater disposal in provincial towns program in South Vietnam – Soc Trang Urban wastewater project, Phase II

Water Supply & Basic Sanitation in Hargeisa

Sustainable Land Management in the Biji catchment area

Technical and Vocational Education and Training (TVET), Mozambique

Irrigation program „Water and climate change“ PACC I

IWRM / Kaps Dam at Akhouryan River, Phase 1

Kaps Dam was partially constructed for irrigation purposes during the 1980s, but not completed. The uncompleted dam is a permanent hazard, as the river diversion using the construction tunnel may not cope with extreme floods with potential serious consequences to the downstream areas, including the outskirts of Gyumri city. The Kaps dam and reservoir are in a highly seismic zone with active faults, with difficult geological and seismic conditions.

The project measures comprise rehabilitation and construction of Kaps Reservoir of 25 million m³ including appurtenant structures (embankment, spillway, diversion tunnel, irrigation tunnel, tunnel for conveyance system). The measures shall allow for the increase of Kaps reservoir at later stage of up to 60 million m³. The main Tasks are
I. Assistance and Coordination in overall Project Steering/Management and Quality Assurance during the entire Project
II. Update of Feasibility Study, Preparation of Detailed Design & Tender Documents (FIDIC Pink Book), Assistance in Tendering
III. Construction Supervision for Phase 1

National Solid Waste Management Programme (NSMWP)

Second Dushanbe Water Supply Project (DWSP2 / DWSP2af)

Water supply and sanitation for small towns in Bustillos

Land Husbandry, Water Harvesting and Hillside Irrigation Project LWH

Oguz-Gabala-Baku Water, Phase I – III

PTOP – Provincial towns open program

Kampala Water – Lake Victoria WatSan Project – Package 1 and 3 Rehabilitation and Water Production Capacity Optimisation of Ggaba Water Treatment Complex & Transmission Improvement

Technical assistance for the feasibility study and designs for water investments in 6 towns

Rural Water Supply and Sanitation in the region Mayo Kebbi West

Consultancy Services for Water and Sanitation in Mtwara and Babati and for Sanitation in Kigoma, Lindi and Sumbawanga

Technical assistance in project preparation in the wastewater and drinking water sector

Municipal Infrastructure Limon

Primary and secondary education of the Methodist church II

Consultancy services for detailed design and construction supervision for water distribution network rehabilitation and expansion in Lilongwe city

Moshi Rural District Water Supply

Water supply Loukkos

Water Management and Development Project (WMDP) Feasibility study, detailed design and tender documents for Mbale & Small towns Water Supply and Sanitation project

Improving and developing water supply and sanitation systems in rural communities

Water Supply and Sanitation Programme for Nzoia Cluster Phase I, II and III

JOBS

Are you interested in collaborating or working with us?

Only as a team can we be successful in what we do.
Providing consultancy and engineering services for improved living conditions.
As a team of engineers and specialists embedded into a network of partner companies, we are continuously looking for new members to join our team. Contact us and find your role.

All Jobs

Anmelden