Feasibility study – Sanitation and rainwater drainage project in Al Khalidiya
Feasibility study – Sanitation and rainwater drainage project in Al Hamza
Rural Water Supply IV
Clean Town – Pink Lake, Nakuru Town Development and Biodiversity Conservation Project (LNBCP)
Tanzania – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Kenya – Lake Victoria Basin Integrated Water Resources Management Programme (PIC) – Lot 2
Consulting Services for the reconstruction and expansion of sewerage systems in Nukus, Takhiatash, Khodjeyli and Kungrad of Karakalpakstan
IWRM Plan for Serengeti National Park
Perú, Programa PTAR – II Estudios de Pre-inversión para Chimbote y Nuevo Chimbote
MUGLA Wastewater Project
Mugla Province stretches along Turkey’s Aegean coast and encompasses the main tourist area of Turkey along the Mediterranean Sea. To achieve the projects objectives and to improve water quality of the Mediterranean Sea the following measures are to be implemented:
- Turgutreis WWTP Construction and Deep-Sea Outfall (Capacity: 37.000 m3/d)
- Bodrum Sewerage Network Construction (100 km)
- Rehabilitation of 28 Existing Wastewater Treatment Plants
- Marmaris New WWTP Construction and Deep-Sea Outfall (Capacity: 60.000 m3/ d)
- Fethiye Hisarönü and Ovacık Sewerage Network Construction (100 km)
- Fethiye Sewerage Collectors Construction (25 km)
Improved water and wastewater services program II (IWSP II)
Improved water and wastewater services program (IWSP I), Phase 2
As the Implementation Consultant of the large investment Program IWSP 1, we are providing comprehensive project implementation and management services on behalf of the Project Management Unit (PMU). The Investment Component aims at improving the physical water supply and wastewater infrastructure in four target Governorates.
The Technical Assistance Component supports the PMU of the Holding Company for Water and Wastewater in the overall technical and financial program management. The investment budget for the program is 272 mEUR covering about 60 singular measures (water supply and wastewater) from Phase 1 to be completed as well as about 70 singular projects (wastewater only) to be prepared and implemented under Phase 2.
For improvement of the water supply services 11 water treatment plants were constructed. The total water supply network implemented has a length of 250 km. In the wastewater sector 10 WWTPs were rehabilitated/extended and two new WWTPs constructed. Rehabilitation/extension of the sewer network covers 676 km of network including 34 pumping stations.
Maseru Wastewater Project
Feasibility Study for water and wastewater Himara
Consulting Services for the extension of sewerage network Esquema Cajamarquilla, Nieveria y Cerro Camote
Program Guadalquivir Water and Sewerage
Wastewater Disposal in Provincial Towns Can Tho, Soc Trang, Tra Vin
Rural Water Supply III
Lusaka Sanitation Program
Consulting Services for the implementation of PMRI II (Juliaca)
Wastewater disposal in provincial towns program in South Vietnam – Soc Trang Urban wastewater project, Phase II
Water supply and sanitation for small towns in Bustillos
Urban Governance and Decentralisation Programme (UGDP)
Improving the capacity of the Holding Company for Water and Waste Water (HCWW)
PTOP – Provincial towns open program
Consulting services to determine the feasibility of water supply and wastewater investments in 12 Rayons
Environmental and social impact assessment ESIA / Lusaka Wastewater Project
Technical assistance in project preparation in the wastewater and drinking water sector
Municipal Infrastructure Limon
Feasibility Study for Water Infrastructure in Central Moldova
South-eastern Turkey at Mersin on the Mediterranean Sea
Component LAIF- consulting services for Wastewater Management and Reuse in Lima
Technical Assistance for Preparation of Integrated Water Measures in Pernik and Vidin
Water Management and Development Project (WMDP) Feasibility study, detailed design and tender documents for Mbale & Small towns Water Supply and Sanitation project
Water Supply and Sanitation Programme for Nzoia Cluster Phase I, II and III